06-14-2011, 07:59 AM
Being as I only need 12 switches for this layout buying a track jig did not seem that cost effective. I figured I could just order the switches I needed and put them, well so much for that great planning
I had some more spare time and was able to knock out the Brooks Scanlon spur track. It still needs more weathering and I need to connect the wiring, but it is on the right track...

I had some more spare time and was able to knock out the Brooks Scanlon spur track. It still needs more weathering and I need to connect the wiring, but it is on the right track...
![[Image: Bend+58.jpg]](http://2.bp.blogspot.com/-jmWoIlFNvvA/TfbfAGblcUI/AAAAAAAAAx0/sJisucrwheM/s1600/Bend+58.jpg)