Walther's New Steel Industry ~~ **Future Plans**
#32
I was advised that if i would want to do some running on the second level with my large engines, that i needed to raise the minimum radius for the entire level from 22" to at least 28" so thats what i did lol. It made it so i needed to make some basic changes to the plan involving the small yard and the lead to the Ore Dock. Here is what i did with the new plan and the 28" minimum radius

[Image: c16ebff6.jpg]

The Top level, which will be the mill itself, will not have to have such a large radius, and i can stick too 22" because i wont be running anything more then little switchers and small geeps
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: