Southern Pacific Switching Layout
Justinmiller171 Wrote:It wasn't the operations that were bothering me, it was that the area seemed too cramped and visually it looks a little too "artificial".

I plan on changing it to either an interchange track for when I run it as a short-line or a track leading to an "invisible industry" for when I run it as an industrial spur.
Very well done Thumbsup That was the reason why I tried to "push" you to do some hardware. Brain and paper planning is one thing but seeing the real thing and getting a feeling for the dimensions and the optical impression is another thing.
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)