Southern Pacific Switching Layout
Would CSAO ever operate an isolated spur like the one in my plan?

Or would any other railroad keep an engine at an industrial spur, where the railroad's local would exchange cars of the track leading to the spur, then the engines stationed at the spur would do the switching?
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)