09-12-2011, 11:22 AM
A Class 1 railroad might station a switcher at an industrial track if the traffic warrants. A more likely scenario would be to have a shortline handle the switching.
Justin, don't over think your layout too much. I know, I'm guilty of that. Just stick with a simple track plan that serves an industry(ies) which have a lot of traffic and a mixture of cars for that traffic.
Justin, don't over think your layout too much. I know, I'm guilty of that. Just stick with a simple track plan that serves an industry(ies) which have a lot of traffic and a mixture of cars for that traffic.
Mike Kieran
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.
Port Able Lines
" If the world were perfect, it wouldn't be " - Yogi Berra.