09-20-2011, 06:19 AM
I did toy around with the spare space of the mill and did not find a replacement that is overwhelming attractive to me. The ordered conveyors arrived today too. They are very nice and I really would like to have them on my layout.
So I made up another story to solve the problem of a dramatic compressed industry side by side with 1:87 buildings.
The mill model will be as good as possible in 1:87 scale. It is not a model of the GM in Vernon but a freelance model of a smaller mill build at the same concept as the GM in Vernon.
I think that change will not be visible to you on photos but it is my mind setting working on the freelance model of a mill.
So I made up another story to solve the problem of a dramatic compressed industry side by side with 1:87 buildings.
The mill model will be as good as possible in 1:87 scale. It is not a model of the GM in Vernon but a freelance model of a smaller mill build at the same concept as the GM in Vernon.
I think that change will not be visible to you on photos but it is my mind setting working on the freelance model of a mill.
Reinhard