Southern Pacific Switching Layout
Mike Kieran Wrote:Justin,

Why did you give up the Food Company? Food processors are great sources of traffic. I was suggesting that instead of a storage track, you could put in a building supply (an edge of the layout industry). It just seems that the entire right side of the layout is one big drill track.

This may sound strange, but I don't want too much operation on this layout, Consolidated Container will provide plenty of operation by itself, Premier chemical and the Building supply are just for added interest

A storage track is required for this layout, there is no drill track on this layout since there are no empty tracks, I can't use the right side of the layout as a drill track since there is no runaround. And I don't want a runaround Misngth
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 4 Guest(s)