11-03-2011, 05:28 PM
Nice work Doc
After soldering up a bunch of railings together it was time to build some more walkways and add the railings.
Along with the railings I also started on some of the electrical conduit.
"Notice" no more than -4- ,90 degree bends with out a pull point. Still have to keep it up to code..
After soldering up a bunch of railings together it was time to build some more walkways and add the railings.
Along with the railings I also started on some of the electrical conduit.
My other car is a locomotive, ARHS restoration crew
