11-06-2011, 03:55 PM
Ralph Wrote:Actually I was considering some "Low Clearance" signs on the tunnel since it is so low. ...I would assume that information is in the time table for the engineer and the yard master assigning e.g. high cube cars to that route should have the information too. I read that kind of information is available when double stacked trains are routed because there are tunnels that can not handle those cars (there is a youtube video demonstrating what happens when it is not :o ). It might be to late to show the engineer a signal informing him he will crash the top of most of his cars in about 10 seconds...
Reinhard