11-21-2011, 02:06 AM
FCIN Wrote:So how'd the operating session go Justin?
Been playing around with having the Proctor & Gamble peanut butter plant as my main industry too. Thinking that it might be better to have the one large industry along with a handful of smaller one's. Track plan I drew up look's promising, but haven't worked up the nerve to change the track around to test it out.
Well, It went okay except that half-way through the session I had to stop and adjust some of the freight cars since I had tightened the truck alittle too much on a few of them, I have also been having some more problems with the track, since I only have one set of feeder wires attached to the layout the track on the far end of the layout are very problematic, one small bump and they lose power, I think I will have to get rid of the leg section of the layout and move the feeder wires up a little bit.
Ed, my peanut butter plant is really fun to operate, I highly suggest you try it.
Justin Miller
Modeling the Lebanon Industrial Railway (LIRY)
Modeling the Lebanon Industrial Railway (LIRY)