12-28-2011, 04:47 AM
Just to clarify - my comment was about Carl's Olympian track plan, not about Shortliner Jack's plan - which is a perfectly fine small urban freight switching plan.
Not sure it would make much sense to try to "work some passenger trains in" on Shortliner's plan either. I would think that pretty much the only way to do something vaguely meaningful with H0 scale passenger cars in 1 x 6 feet would be to set aside maybe 30" for cassette staging or someting, and model very short (as in engine and two passenger cars) trains pulling into or departing from a terminal (immediately going into staging or coming out of staging).
But I could very well be wrong. Any ideas about working in passenger trains, Jack?
Smile,
Stein
Not sure it would make much sense to try to "work some passenger trains in" on Shortliner's plan either. I would think that pretty much the only way to do something vaguely meaningful with H0 scale passenger cars in 1 x 6 feet would be to set aside maybe 30" for cassette staging or someting, and model very short (as in engine and two passenger cars) trains pulling into or departing from a terminal (immediately going into staging or coming out of staging).
But I could very well be wrong. Any ideas about working in passenger trains, Jack?
Smile,
Stein

