My "Southern Rwy & Graham County RR" layout
#56
Waldbahner Wrote:...
2. Place the terminus modules to the left of the window and add a lift off bridge between the layout parts.
I'm not sure, which option will be the better one, but I'm going more and more familliar with the second one...]

Gerd, that window is not too wide. I assume a hatch would be very well doable. A hatch would be also an easy way to ensure electric connection to the very left part. You should have a protection section in the tracks on both sides to stop all engines approaching the open hatch. I did omit it ones and payed the penalty of one engine Sad
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)