Building a Module; CAT Equipment Rental Building
#54
doctorwayne Wrote:Looks good, Josh, but you need some "scabs" between those piled pre-cast sections so that the operator can get the forks under the section which he wants to lift. Some basswood or styrene strips of an appropriate thickness will do the trick - of course, if you use styrene, paint it to look like wood. Goldth

Wayne

Forgot to mention that lol. I need to get some 6x6"x8' pieces of lumber to put in between each of those slabs. And of coarse i need a new forkilft that would be more to prototype and scale lol

out here in Cali, we call the "scabs" stickers lol Misngth
Josh Mader

Maders Trains
Offering everyday low prices for the Model Railroad World
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)