04-10-2012, 02:39 AM
Good morning,
last week, we build the new module and I also got the tracks in place. The curve has a 24" radius. A bigger one wasn't possible.
I also start work on the furniture factory. This week, we'll build the bridge for the window bay to get Topton connected to the rest of the layout.
Here're some pics.
![[Image: Fur_7i.jpg]](http://www.gerds-modellbahn.de/SOU/Anlage/Furniture/Fur_7i.jpg)
Click on thumbs to enlarge...
Bye, Gerd
last week, we build the new module and I also got the tracks in place. The curve has a 24" radius. A bigger one wasn't possible.
I also start work on the furniture factory. This week, we'll build the bridge for the window bay to get Topton connected to the rest of the layout.
Here're some pics.
![[Image: Fur_7i.jpg]](http://www.gerds-modellbahn.de/SOU/Anlage/Furniture/Fur_7i.jpg)
Click on thumbs to enlarge...
Bye, Gerd
