01-31-2009, 12:03 PM
I don't have 44' X 52' to build a layout in, but when I add my three 2' X 4' modules to the rest, we have a 44' X 52' layout to run l o n g trains on.
Being on active duty, I had to be able to move every three years, so, my 8' X 16' layout was modular. each module was 24" X 3' 10-1/2", so they would fit in a crate made of two 4' X 8' sheets of 3/4" plywood. That layout was finally "de-constructed". I don't have any place for it now.
There was this:
From fifty years ago!
Being on active duty, I had to be able to move every three years, so, my 8' X 16' layout was modular. each module was 24" X 3' 10-1/2", so they would fit in a crate made of two 4' X 8' sheets of 3/4" plywood. That layout was finally "de-constructed". I don't have any place for it now.
There was this:
From fifty years ago!
We always learn far more from our own mistakes, than we will ever learn from another's advice.
The greatest place to live life, is on the sharp leading edge of a learning curve.
Lead me not into temptation.....I can find it myself!
The greatest place to live life, is on the sharp leading edge of a learning curve.
Lead me not into temptation.....I can find it myself!