07-09-2012, 07:37 AM
The road is continued to the west. It is tilt to the left to cover the gap of the removable section in front of the balcony door. That way are structures either permanent installed (glued) on the main layout (left) or temporary "put" on the removable part (right). I did miss that design point in the past and got some problems and inflexibility placing buildings.
I decided to have no sidewalks even I would like to do so. They would interfere at several locations with the tracks and result in unusual not very prototypical solutions. Better no sidewalks than lousy ones......
I decided to have no sidewalks even I would like to do so. They would interfere at several locations with the tracks and result in unusual not very prototypical solutions. Better no sidewalks than lousy ones......
![[Image: cf9b2c06.jpg?t=1341840415]](http://i966.photobucket.com/albums/ae149/faraway52/FL2012/cf9b2c06.jpg?t=1341840415)
Reinhard