Building the Walthers N Blast Furnace ~~ Start to Finish
#5
Was to start the Cast House. This is one of the 3 support walls. Again, the brick encasement's have been sprayed grey instead of that nasty yellow!

[Image: Step16.jpg]

Step 17
Here is the finished Cast House. Next, the Upper Cast House Floor will be installed.

[Image: Step17.jpg]

[Image: Step17-1.jpg]

Step 18
Was to paint the Cast House 2nd level floor to the rust brown primer color. This was also the ugly yellow color that the brick encasement's were molded in. This pic is of it still wet, it will dry the same color as the Furnace. You can see were the molten hot steel would run along the paths to waiting hot metal cars on the tracks below.

[Image: Step18.jpg]

Step 19
Here are some pics of the Cast House Top Level Floor in it's final postion over the Cast House and Main Furnace Room. I glued the floor down and added another wall to the Main Furnace Room wall. I also added Slag Runner Roof Supports.

In the next 2 or 3 steps, you will see the main building take shape with roofs and the rest of the walls being added on

[Image: Step19.jpg]

[Image: Step19-1.jpg]

[Image: Step19-2.jpg]

[Image: Step19-3.jpg]

[Image: Step19-4.jpg]