HO Freelance Shelf / Switching Layout
#54
Just using this plan as shown:     would duplicate the operations as Speed, IN, fairly well in the limited space. Allows for both the small cement hoppers and a couple of 50ft box cars to be loaded at the large shed in the rear. Engine pulls inbound empty cars off interchange track; then places empties and pulls loads for the interchange as required.
Ed
"Friends don't let friends build Timesavers"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)