01-23-2013, 09:17 PM
Here are some updated pics...
![[Image: DSC_0110-1_zps29a52169.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0110-1_zps29a52169.jpg)
The end platform starting to come together. I plan on putting a handrail all around the platform.
![[Image: DSC_0111-1_zps2ac760d2.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0111-1_zps2ac760d2.jpg)
Here are the steps. They will also get handrails on both sides.
Overhead view of the platform and steps. There will be a tool rack with long bars with hooks and picks on the end for helping to open/close hopper doors, or poke/break aggregate stuck in the hoppers, along with a selection of shovels and brooms for cleaning up the walkways after unloading a car. I also installed some wheel stops in front of the bumpers for redundancy in making sure the cars are stopped before rolling off the end...
![[Image: DSC_0112-1_zpsa9285572.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0112-1_zpsa9285572.jpg)
Started installing the decking, I'm over half done.
![[Image: DSC_0113-1_zpse7863b98.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0113-1_zpse7863b98.jpg)
![[Image: DSC_0114-1_zps05ff62bb.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0114-1_zps05ff62bb.jpg)
So, that is where I'm at today. More in a few days.
Suggestions on constructing handrails would be welcome. Especially on whether I should use wooden railings or metal rails and stanchions in this application.
Dave
![[Image: DSC_0110-1_zps29a52169.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0110-1_zps29a52169.jpg)
The end platform starting to come together. I plan on putting a handrail all around the platform.
![[Image: DSC_0111-1_zps2ac760d2.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0111-1_zps2ac760d2.jpg)
Here are the steps. They will also get handrails on both sides.
Overhead view of the platform and steps. There will be a tool rack with long bars with hooks and picks on the end for helping to open/close hopper doors, or poke/break aggregate stuck in the hoppers, along with a selection of shovels and brooms for cleaning up the walkways after unloading a car. I also installed some wheel stops in front of the bumpers for redundancy in making sure the cars are stopped before rolling off the end...
![[Image: DSC_0112-1_zpsa9285572.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0112-1_zpsa9285572.jpg)
Started installing the decking, I'm over half done.
![[Image: DSC_0113-1_zpse7863b98.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0113-1_zpse7863b98.jpg)
![[Image: DSC_0114-1_zps05ff62bb.jpg]](http://i27.photobucket.com/albums/c195/dave08/DSC_0114-1_zps05ff62bb.jpg)
So, that is where I'm at today. More in a few days.
Suggestions on constructing handrails would be welcome. Especially on whether I should use wooden railings or metal rails and stanchions in this application.
Dave
-Dave
