02-11-2013, 03:06 AM
Good morning,
the last couple days, I completed my rollling stock and added a GP38, GP18 and a better SD9, all equipped with DCC.
I now that the SD-units where not used on the Murphs Branch by the Southern, but I like to have a 6-axle diesel loco in my fleet.
![[Image: GP38i.jpg]](http://www.gerds-modellbahn.de/SOU/Fahrzeuge/GP38i.jpg)
Meanwhile I collected a couple of structures for Robbinsville and I'll start with the assembling this week. I bought the plywood for the first two modules "GCRR-Yard" and "Tallulah Creek" as well, but it's still to cold (and to messy) in the workshops to get started with the modul boxes. But I hope for better weather and some spare time the next weeks to clean up the workshop and finally get started with the GCRR-division. All in all, there are 5 new modules planed for this extension.
Cheers, Gerd
the last couple days, I completed my rollling stock and added a GP38, GP18 and a better SD9, all equipped with DCC.
I now that the SD-units where not used on the Murphs Branch by the Southern, but I like to have a 6-axle diesel loco in my fleet.
![[Image: GP38i.jpg]](http://www.gerds-modellbahn.de/SOU/Fahrzeuge/GP38i.jpg)
Meanwhile I collected a couple of structures for Robbinsville and I'll start with the assembling this week. I bought the plywood for the first two modules "GCRR-Yard" and "Tallulah Creek" as well, but it's still to cold (and to messy) in the workshops to get started with the modul boxes. But I hope for better weather and some spare time the next weeks to clean up the workshop and finally get started with the GCRR-division. All in all, there are 5 new modules planed for this extension.
Cheers, Gerd
