01-27-2015, 04:26 AM
Hi there,
Andy,yes but is a fun doing that work....
So I made some small progress last week on the basework for the new area.Changed the benchwork ,added subroadbed and some wood for the roads.Also added some first foam for the scenery...around the bridge and road underpass I will use some fine mesh and plaster strips....I have to rise the tracklevel to pass over the radiator.Here are some photos where I´m for now....
![[Image: 26.01.15%2B-%2B2]](https://lh3.googleusercontent.com/-WScZbgqlN2s/VMXePh2NJXI/AAAAAAAAHlg/wLfJiKBCD7o/w392-h696-no/26.01.15%2B-%2B2)
left track in the front is the spur to the canfor planer mill,right track is will pass over the fold down bridge into the staging.
![[Image: 26.01.15%2B-%2B5]](https://lh3.googleusercontent.com/-8RgETBXRkeA/VMXePg5V4rI/AAAAAAAAHlg/k1ZwsN1ZwTI/w392-h696-no/26.01.15%2B-%2B5)
Left subroadbed for the track and right side is the base for the road.This is the area I´ll do the scenery with fine mesh and plaster....
![[Image: 26.01.15%2B-%2B4]](https://lh4.googleusercontent.com/-rtDoIpi1KOA/VMXePglCFlI/AAAAAAAAHlg/nvDz-7MG8f8/w392-h696-no/26.01.15%2B-%2B4)
Tracks pass over the radiator and go on around the wall and finaly enter the helix.There will be a small rural village to the right side of the radiator with a teamtrack,some lasercut structures around,gas station etc...
This week I´ll mount the track and turnouts,wire and paint it and will do some scenery work.I also will adjust the subraodbed and track for the bridge etc...So still a lot to do,more progress will follow,soon.Any comments are very appreciated...
Thanks for looking,
Cheers,Chris
Andy,yes but is a fun doing that work....
So I made some small progress last week on the basework for the new area.Changed the benchwork ,added subroadbed and some wood for the roads.Also added some first foam for the scenery...around the bridge and road underpass I will use some fine mesh and plaster strips....I have to rise the tracklevel to pass over the radiator.Here are some photos where I´m for now....
left track in the front is the spur to the canfor planer mill,right track is will pass over the fold down bridge into the staging.
Left subroadbed for the track and right side is the base for the road.This is the area I´ll do the scenery with fine mesh and plaster....
Tracks pass over the radiator and go on around the wall and finaly enter the helix.There will be a small rural village to the right side of the radiator with a teamtrack,some lasercut structures around,gas station etc...
This week I´ll mount the track and turnouts,wire and paint it and will do some scenery work.I also will adjust the subraodbed and track for the bridge etc...So still a lot to do,more progress will follow,soon.Any comments are very appreciated...
Thanks for looking,
Cheers,Chris
Building the BC-Rail Dawson Creek Subdivision in H0 scale http://bigbluetrains.com/forum/viewtopic.php?f=46&t=7835
