Building an Airbrushing Booth.
#19
A little bit more done this morning.

I cut a rectangular opening on one side panel for the device box, and drilled a 3/8 hole on the panel for the other side to accommodate the tool cord.

[Image: DSC02823.jpg]
[Image: DSC02825.jpg]

I then installed the device box and switch on the one side and threaded the cord through the other side.

[Image: DSC02824.jpg]
[Image: DSC02826.jpg]

I then put the sides on and re-tested my wiring.

[Image: DSC02827.jpg]
[Image: DSC02829.jpg]
[Image: DSC02828.jpg]
[Image: DSC02830.jpg]

Tonight, I'll begin to glue and assemble the pieces permanently. One obstacle I need to figure out is how to connect the exhaust vent to the station. I have a couple of ideas, I'm just trying to figure out what will be the best solution.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)