07-08-2013, 08:55 PM
Toronto got dumped on today. More rain in 2 hours that usually in the whole month ... 105mm or so (>4").
Roads with dips are flooded to the tops of cars. One GO line that goes up the side of a river is flooded -- looks like to the bottom of the windows on the double deckers (lower floor) -- reports from inside say 3' of water.
Subway is fragmented; power is out. Passengers are waiting for buses and complaining how few there are; where do they think they'll be coming from?
We're fine -- bit of water running down the streets.
Oh, the water flooding the roads is mixed with sewage, of course.
<!-- m --><a class="postlink" href="http://www.thestar.com/news/gta/2013/07/08/environment_canada_issues_special_weather_statement_for_thunderstorms.html">http://www.thestar.com/news/gta/2013/07 ... torms.html</a><!-- m -->
Roads with dips are flooded to the tops of cars. One GO line that goes up the side of a river is flooded -- looks like to the bottom of the windows on the double deckers (lower floor) -- reports from inside say 3' of water.
Subway is fragmented; power is out. Passengers are waiting for buses and complaining how few there are; where do they think they'll be coming from?
We're fine -- bit of water running down the streets.
Oh, the water flooding the roads is mixed with sewage, of course.
<!-- m --><a class="postlink" href="http://www.thestar.com/news/gta/2013/07/08/environment_canada_issues_special_weather_statement_for_thunderstorms.html">http://www.thestar.com/news/gta/2013/07 ... torms.html</a><!-- m -->
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
