08-01-2012, 01:25 PM
To prevent the whole project from becoming to overwhelming, we opted to build the layout in several stages. The first phase is a peanut shaped oval with a diagonal reversing track, measuring around 10 x 3.5 meters. Here are some pics from the construction process the last four weeks:
The track plan was transferred from the computer using X and Y coordinates and a tape measure, and marked with spray paint. Steel poles were driven into the ground, and posts of 2" by 2" bolted to these, using a level to ensure correct height for all the posts:
For extra protection, we used drainage pipes outside the posts, since the whole area will later be landfilled up to track level:
On top of the posts come the subroadbed for the track, this is how far we have come by this evening:
Svein
The track plan was transferred from the computer using X and Y coordinates and a tape measure, and marked with spray paint. Steel poles were driven into the ground, and posts of 2" by 2" bolted to these, using a level to ensure correct height for all the posts:
For extra protection, we used drainage pipes outside the posts, since the whole area will later be landfilled up to track level:
On top of the posts come the subroadbed for the track, this is how far we have come by this evening:
Svein