Trucklover's 2009 Resolution Challenge ~~ P1
#1
So i have 2 new years resolutions that i would like to accomplish before this challenge ends May 30th, 2009

They will be documented in separate threads. This one will be dedicated to the CAT Rental Module and things that need to be done to complete it. I will place a date completed next to each as i complete them.

List of things that needs to be done are:
  • 1. Repair the roads of damage **COMPLETED ON JANUARY 29, 2009**

    2. Fix CAT Rental Building Equipment Yard

    3. Finish Guard Rail work along the entire front of the module and also add dirt/weeds along the front edge where guard rails run **COMPLETED ON JANUARY 30, 2009**

    4. Assemble the Pre-cast Concrete Segments that came with the Great West Pre-Stress Building **COMPLETED ON JANUARY 27TH, 2009**

    5. Start Construction on the new Bridge extention. This includes setting up concrete forms and laying the "re-bar" using piano wire for casting the two bridge abutments

    6. Make one more Power Pole so i can re-route the Power Poles around the New Bridge Extension Area

    7. Paint the front edge of module brown **COMPLETED ON JANUARY 30, 2009**


Okay thats a list of things that need to be completed on this module Misngth Pictures to come soon Thumbsup