06-20-2013, 07:09 PM
NOW - I'm happy!!!!!
I then cut out some 3/4 wood curves and set them down where the track will be and It actually looks like it might work!
I have the front laid out, now comes the fun of crawling around under the layout. Cleaning (vacuuming) and placing the wood roadbed, after I paint it gray (stone ballast gray).
But soon, the MF&W will have FOUR levels of 1:20.3, G scale trains!!!!!
The red box is a Christmas Tree foot switch for lights. I have it controlling a switch stand I'll have in the center of the new loop - lighting the train as it goes around under the layout.
The wiring all has to be supported out of the way, so i have to devise a devilish plan for that too.....
I then cut out some 3/4 wood curves and set them down where the track will be and It actually looks like it might work!
I have the front laid out, now comes the fun of crawling around under the layout. Cleaning (vacuuming) and placing the wood roadbed, after I paint it gray (stone ballast gray).
But soon, the MF&W will have FOUR levels of 1:20.3, G scale trains!!!!!
The red box is a Christmas Tree foot switch for lights. I have it controlling a switch stand I'll have in the center of the new loop - lighting the train as it goes around under the layout.
The wiring all has to be supported out of the way, so i have to devise a devilish plan for that too.....
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???