07-13-2013, 11:05 AM
The structures on that side of the tracks are complete now. The leg reaches the maximum possible hight on my layout due to an overhead cabinet.
The modern conveyor has been added recently and replaced the old in house conveyor as well as the former belt conveyor in the gallery over the concrete solos.
Pulling first grain from the new silos
The modern conveyor has been added recently and replaced the old in house conveyor as well as the former belt conveyor in the gallery over the concrete solos.
Pulling first grain from the new silos
Reinhard