Grande Valley Railway in N version 4.0
#10
Got this much of the new fashia done so far.I have about 34" to do yet then it's black paint time.Plus some BS brown paint to cover the pink plains.smile emoticon
I need to build some legs to go either side of the notch to help keep this part level.With out the junk you see under the layout there is a noticeable sag when I place the 4' level on the top edge.

[Image: GVR-Layout_4.0-a.jpg]
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)