Christmas op sessions
#1
day 1
Bill as conductor and me as engineer.
We ran 1 train.
day 2...
Marlin as conductor and me as engineer.
We ran 1 train
Anthony and me had op session and we switched between conductor. and engineer.
We ran 5 trains.

pictures of the op sessions here <!-- m --><a class="postlink" href="http://model-railroad-hobbyist.com/node/24899#comment-223158">http://model-railroad-hobbyist.com/node ... ent-223158</a><!-- m -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)