03-08-2016, 07:55 AM
I model a branchline and two shortlines, no mainlines here. I use the 4 cycle car card and waybill system. Works great, if I/we need to stop we can go back later and pick up right where we left off. Restaging between sessions is minimal. Fill the cards out once and you are set for life. You can add/remove cars at will with no interference with the operations.
Mike
Sent from my pocket calculator using two tin cans and a string
Sent from my pocket calculator using two tin cans and a string