01-08-2016, 05:15 PM
Thanks guys!
Just one more update before bedtime (this is after all Europe, a tad different time zone... )
Filed grooves for the cables.
Soldered the wires to the Code 70 Micro Engineering rails.
The rails spiked and glued!
I use Railway engineering rollee holders.
Just one more update before bedtime (this is after all Europe, a tad different time zone... )
Filed grooves for the cables.
Soldered the wires to the Code 70 Micro Engineering rails.
The rails spiked and glued!
I use Railway engineering rollee holders.