04-12-2019, 10:14 PM
(This post was last modified: 04-12-2019, 10:15 PM by jim currie.)
has anyone used a gauntlet as a operation challenge one end of current layout being built will be serviced by the astf and the dgr&w both having separate yards. my road the pb&l has trackage rights on the sf , there is only space for one track between buildings going into town . my question would joining both roads before bridge with a turnout then separating them after bridge and town access or run a gauntlet over bridge and town access ?