Stone trains in operation on Anderslej
#1
The 642 brings the empty hoppers off the non-electrified line from the low level sidings onto the main line
[Image: stonerun01.jpg]

...and arrives in the station where an electric loco is waiting to take the train onwards
[Image: stonerun02.jpg]

The Duro leaves the hoppers and the 189 takes over
[Image: stonerun03.jpg]

the 189 departs....
[Image: stonerun03a.jpg]
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#2
....and after a circuit of the layout, arrives in the freight loop
[Image: stonerun03b.jpg]

where it leaves the hoppers for shunting
[Image: stonerun03c.jpg]

The Kamnolom Anderslej shunter pushes the hoppers towards the loader
[Image: stonerun04.jpg]

Three wagons are placed in the far track
[Image: stonerun05.jpg]

and the other three pushed under the loading shute
[Image: stonerun06.jpg]
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#3
[Image: stonerun07.jpg]

when the first three are loaded, the others are collected and loaded
[Image: stonerun08.jpg]

after running round, the loaded train is pushed into the siding for collection by an electric locomotive
[Image: stonerun09.jpg]

then the 189 couples ready for the return run
[Image: stonerun10.jpg]
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#4
after a circuit of the layout, it arrives on the inner track where it will hand over to the waiting Duro
[Image: stonerun11.jpg]

[Image: stonerun12.jpg]

which takes the train onto the non-electrified track down to the sidings for unloading
[Image: stonerun13.jpg]

[Image: stonerun14.jpg]
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#5
Very nice sir.I like those hoppers,and the Duro looks like it would make an easy US Gen Set conversion.

Rest of the layout is looking fine too. :mrgreen:
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply
#6
That is a great operating layout.
Reinhard
Reply
#7
Thanks guys. I had an operating stone loader on a previous Belgian layout which I showed at various exhibitions. Viewing public loved the operation, so I was determined to have one on this layout. Goldth
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#8
Thanks for letting us ride along! I like the operations scheme!
Ralph
Reply
#9
Cheers with Ralph, and it's always nice to have an operating scheme where you can actually see the movement of the commodity, from supplying the empties, to loading, and then delivery to the final destination. Thanks for the ride. Goldth

Wayne
Reply
#10
Very impressive Alan---a wonderful combination of great modelling,photography and operational possibilities Worship
Reply
#11
Now made a video of the operation.

http://www.youtube.com/watch?v=7ScEimlk8Ls
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#12
That is really great. I am impressed how realistic and controlled the cars are filled. The complex mechanic of the conveyor belt makes the difference Thumbsup
Reinhard
Reply
#13
Nicely done. And, you inadvertently answered one of my questions about electrified railroads in europe - whether industries had overhead wires or they needed a diesel to switch cars.
--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Reply
#14
Kevin, on the stone loaders I used as a prototype to copy, the tracks had catenary, but this would obviously not be under the loaders and would finish before them. So locomotives could not go beneath the loaders, except for diesels, of course. For simplicity I made my loader tracks diesel worked only. Wink
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply
#15
Just checked photographs of the loaders at Verd, and the catenary terminates well short of them, so they are diesel worked and trains then placed in electrified sidings for collection by electric locomotives.
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)