04-11-2021, 08:12 PM
Now for all of you that think that years of experience make us knowledgeable...
I replaced all the track, checked each joiner and threw the switch.....and Nothing Happened
Looking at the wiring, I saw no issues, I even wiggled the supply connections.
That left the diode .... The blue wire after wiggling it, was fine
After trying a few more times I finally pulled on the wire and it didn't move. This was NOT good, seeing it was supposed to be where it is in the picture, between the rail and the tie.
Turns out it was trapped under the plastic. After loosening the track, I freed the wire and stuck it back where it belongs and everything works!! Trolley service has now been restored on the MF&W RR...
Next is the main!!
I replaced all the track, checked each joiner and threw the switch.....and Nothing Happened
Looking at the wiring, I saw no issues, I even wiggled the supply connections.
That left the diode .... The blue wire after wiggling it, was fine
After trying a few more times I finally pulled on the wire and it didn't move. This was NOT good, seeing it was supposed to be where it is in the picture, between the rail and the tie.
Turns out it was trapped under the plastic. After loosening the track, I freed the wire and stuck it back where it belongs and everything works!! Trolley service has now been restored on the MF&W RR...
Next is the main!!
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???