11-19-2015, 01:02 PM
After setting app. 18.000 rivets on the A- and B-unit, I finally decided on the drive-line system: one battery pack with one controller for each truck, connected in master-slave set-up
And I started painting the A-unit...too late in the year (too cold and usually raining, not the best preconditions for painting outside).
Current status (to-do's: some touch-ups, the red lines between brown and yellow, logos on the badges and lettering)
Regards
Norman
And I started painting the A-unit...too late in the year (too cold and usually raining, not the best preconditions for painting outside).
Current status (to-do's: some touch-ups, the red lines between brown and yellow, logos on the badges and lettering)
Regards
Norman