Welcome, Guest
You have to register before you can post on our site.

Username
  

Password
  





Search Forums

(Advanced Search)

Forum Statistics
» Members: 571
» Latest member: sidiseo003
» Forum threads: 10,055
» Forum posts: 182,378

Full Statistics

Online Users
There are currently 646 online users.
» 0 Member(s) | 640 Guest(s)
Applebot, Baidu, Bing, Facebook, Google, Yandex

Latest Threads
Tail End Tuesday
Forum: Shutterbug area
Last Post: tompm
11 hours ago
» Replies: 468
» Views: 432,103
Trains This Day/Month in ...
Forum: Shutterbug area
Last Post: Charlie B
Yesterday, 02:19 PM
» Replies: 1,221
» Views: 589,549
The Hobo Camp Fire Is goi...
Forum: Hobo's Camp
Last Post: FiatFan
Yesterday, 06:54 AM
» Replies: 334
» Views: 48,567
Z scale T-track moduler l...
Forum: Modular Modeling
Last Post: Royal blue
Yesterday, 02:46 AM
» Replies: 0
» Views: 33
2026 Big Blue NASCAR Raci...
Forum: Lower Berth
Last Post: ngauger
09-14-2026, 07:04 AM
» Replies: 78
» Views: 14,250
Here's the new and improv...
Forum: Stop here and say "Hello"
Last Post: FiatFan
09-14-2026, 06:03 AM
» Replies: 217
» Views: 82,175
question
Forum: Upper Berth
Last Post: jim currie
09-14-2026, 01:45 AM
» Replies: 8
» Views: 176
Big Blue has inspired som...
Forum: Upper Berth
Last Post: TMo
09-13-2026, 06:35 PM
» Replies: 175
» Views: 130,256
Rainbows in the Lehigh Va...
Forum: Layouts
Last Post: TMo
09-13-2026, 06:29 PM
» Replies: 713
» Views: 531,860
Northern Alberta Railway ...
Forum: HO Modeling
Last Post: tompm
09-13-2026, 05:00 PM
» Replies: 20
» Views: 1,381
SIDE SHOT SATURDAY
Forum: Shutterbug area
Last Post: bdw9535
09-12-2026, 08:50 PM
» Replies: 757
» Views: 464,157
Photo Fun September 2026
Forum: Shutterbug area
Last Post: bdw9535
09-11-2026, 06:25 PM
» Replies: 8
» Views: 275
Z scale experiment
Forum: N/Z and Smaller Modeling
Last Post: Royal blue
09-11-2026, 02:07 AM
» Replies: 5
» Views: 1,784
Buckeye Freight & Termina...
Forum: Blogs
Last Post: Royal blue
09-11-2026, 01:56 AM
» Replies: 40
» Views: 47,639
Current Projects
Forum: HO Modeling
Last Post: LiveSteamer
09-10-2026, 12:45 PM
» Replies: 490
» Views: 287,022

 
  New carendt.com loading problems
Posted by: teejay - 06-24-2014, 06:33 PM - Forum: Upper Berth - Replies (7)

I'm subscribed to the small layout scrapbook originated by the late Carl Arendt ........problem is I can't get the "supposed new site " to load . Anyone else ? It's www.carendt.com

T

Print this item

  The Hobo Camp Fire Is going well #VII.. Stop In!!!
Posted by: ezdays - 06-24-2014, 07:56 AM - Forum: Hobo's Camp - Replies (5001)

Well, it's been a whole year and well over 3000 posts, so I thought it is time to start a new thread. Welcome one and all.....

Welcome Welcome Welcome Welcome

Print this item

  Chuck's Kitbash Summer 2014 Challenge
Posted by: Chuck - 06-24-2014, 06:29 AM - Forum: Contests & Challenges - Replies (15)

Hey all,
I have acquired several Korber kits over the years and decided it was time to 'bash an auto plant out of them. Thank you summer challenge for motivating me to work on it. If you are not familiar with the Korber line, many of the their kits are modular in design -- perfect for kitbashing. I am using four of their kits to bash an auto plant like the Fisher Body plant. Here are the instructions from the kits to show which ones I am using:
[Image: 20140623_224323.jpg]

Here is the skeleton mock up of what I am planning. The smaller building to the right is included and will be either connected by a bridge or I will build a wall connecting it to the main building with an overhead door for the tracks to enter the building ( and cover up the hole in the backdrop). There will also be a concrete loading dock running the length of the building. I am not sure if I will put a roof over the dock.
[Image: 20131012_103037.jpg]

Chuck

Print this item

  6-24-14 Happy Birthday!
Posted by: ngauger - 06-24-2014, 04:19 AM - Forum: Hobo's Camp - Replies (5)

Congratulations to:

ray_m (57)

Happy B-day and Many More!!!

train 1990_dancing 1990_dancing 548

Print this item

  Planning an N Scale E shaped ISL - 9ft 6 in X 9ft 6in
Posted by: TTRAK_andrew - 06-23-2014, 12:57 AM - Forum: Layouts - Replies (8)

G'day Folks, below is and XtrkCad plan of an N scale industrial switching layout that I am planning to build. The site of the layout is to be a prefabricated metal garden shed of dimensions roughly 10ft by 10ft. As The shed is still to be built (i.e. waiting to be payed off over time in our local hardware store) I am at the moment using dimensions of 9ft 6in by 9ft 6in to make sure my plans will have room to grow and not the need to be pruned. This metal shed will be put up inside our large metal garage as a secure and hopefully almost dust proof home for the layout. The layout will be in domino form to allow for any future moves. The curves are Atlas 9 3/4 inch and 11 inch set-track to use up what I have on hand and to keep constant radius. Atlas switches and set track straights are used in the plan as they make a easy `units' to judge siding capacities etc. At this level of planning the Atlas switches match reasonably closely to the PECO medium radius code 80 units I will actually use. The layout is planned for 1 to 3 operators with a main aim being the ability to operate for just half an hour or so single handed or have two or three people occupied for an hour or two.
The concept of the layout is a largish industrial park with rail service provided by either an independent local operator or an existing short line such as Aberdeen & Rockfish, R J Corman, etc. The A&R operate the separate PeeDee River Rwy and once ran the Dunn Erwin Railway, so taking on a new industrial park in their region would not be out of the question.
At the top of the plan is the main yard where removable storage cassettes provide inward/outward traffic. The orange coloured rectangles represent industrial structures/boundaries.


.jpg   Switching Area 3 Team Track end.jpg (Size: 208.06 KB / Downloads: 2162)

Switching Area 1 would be operated directly out of the yard as if the track distance on the model accurately represented the distance on the fictional prototype. Perhaps only being switched once a day.
Switching Area 2 is meant to be significantly further away from the yard and would be worked by its own out and back train. If a pushing/shoving move was used to get to Area 2 perhaps an old caboose could be used as a shoving platform and I could do away with the run-around siding. I would envisage one to two workings of Area 2 per day with each industry only receiving one switch per day. This area is likely to be hosting mainly chemical based industries, eg. paint manufacture, pool chlorine processor, etc.
Switching Area 3 is a very busy place and a significant distance from the yard. Some of the industries here would receive cuts of 3 to 5 cars at a time, eg. Newsprint warehouse, grocery chain warehouse. A long team track with a specialized lumber transload operation at the end is a feature of Area 3. I would envisage two or three trains per day to Area 3, each with its own assigned industries to switch. Perhaps the Newsprint warehouse might be switched twice a day to have sufficient through put.
By using the Auran TRAINZ simulator I am slowly making an operating computer version of the proposed layout which helps a lot in not only planning operations, but also in achieving visual and functional balance.

.jpg   Metal Shed Layout Draft 1D.jpg (Size: 218.08 KB / Downloads: 2074)

The types of industries I am thinking about creating include: tank-car cleaning and repair facility, newsprint warehouse, lumber transload, Liquid Propane Distributor, Frito-Lay type plant, grocery chain warehouse, bulk cement distributor (eg., Blue Circle), team track, grain transload, logistics warehouse(s), pool chlorine processor, and paint manufacture.

Any critiques, suggestions etc. are gladly welcomed.
Cheers, Andrew G.

Print this item

  3d Printer on Kickstarter
Posted by: nvrr49 - 06-21-2014, 01:59 PM - Forum: Tools - No Replies

This only has four days left, but looks to be the best price I have seen on this type of printer.

https://www.kickstarter.com/projects/kud...nav_search

Print this item

  Crossover question
Posted by: Rscott417 - 06-21-2014, 12:22 PM - Forum: HO Modeling - Replies (3)

Im looking to have a 2 track mainline that are 2 inches apart from the center of the ties with a runaround/crossover, what number turnouts would i need to keep the mainline tracks 2 inches apart? I have some extra #5s and thought about cutting back the curved track on both ends but doesn't seem like that will work.

Print this item

  WPF 6/20 to 6/27
Posted by: e-paw - 06-20-2014, 05:58 PM - Forum: Shutterbug area - Replies (20)

I was working on Pier C in Hoboken and was able to get a few shots of the rebuilt clock tower on the DL&W (now NJT) station.


.jpg   003 - Copy.JPG (Size: 96.28 KB / Downloads: 1622)


.jpg   001 - Copy.JPG (Size: 144 KB / Downloads: 1637)

Print this item

  I might have to give this a try.
Posted by: e-paw - 06-20-2014, 04:07 PM - Forum: Tours, Events and Shows - Replies (1)

<!-- m --><a class="postlink" href="http://poconobiking.com/trails/train-and-bike/">http://poconobiking.com/trails/train-and-bike/</a><!-- m -->

Print this item

  Loco Disassembly?
Posted by: cid - 06-19-2014, 09:34 PM - Forum: HO Modeling - Replies (1)

My friend Charles has purchased a used Genesis #9001 Dash 8-40, and he is trying to remove the radiator (per the instruction sheet) to access the decoder board and jumper plug. Supposedly it just lifts up in the front, but it's so tight we're afraid of breaking something. Anyone know if there's a trick to it? Wallbang

Print this item